Braz. arch. biol. technol ; 64(spe): e21210133, 2021. graf
Artigo em Inglês | LILACS | ID: biblio-1278462

RESUMO

Abstract The continuity of an electrical system's services is linked to its equipment's correct operation. The more correctly they worked, the higher the quality of the services provided. Thus, they must have their functioning scanned closely and that minor defects have their evolution monitored. This fact creates the possibility of making predictions about how long equipment can operate without compromising the system's continuity. This follow-up is proper for predictive maintenance. This paper presents three on-going COPEL Generation and Transmission projects in essential elements of its electrical system: circuit breakers, lightning arresters, and SF6 substation. The central idea of all monitoring projects is to check the early problem in this equipment and facilities.


Assuntos
Manutenção Preventiva , Monitoramento Ambiental , Equipamentos e Provisões Elétricas , Pesquisa Aplicada
2.
Braz. arch. biol. technol ; 64: e21210138, 2021. graf
Artigo em Inglês | LILACS-Express | LILACS | ID: biblio-1355808

RESUMO

Abstract The planning of a new thermal power plant is linked to the various decision elements and evaluation criteria. Factors such as the plant's geographic positioning, primary energy supply points, paths, and means of delivery of this primary energy should be analyzed. Similar studies are imposed when studying the change of a thermoelectric plant's primary energy source occurs. In Brazil, several plants are currently investigating the exchange of their primary fuel from oil to gas due to the decrees issued by ANEEL. This paper presents software, which uses virtual reality to assist in the various stages of the planning process and in the analyses that must be performed. This software was developed for the Hidrotermica Group and had as the primary target the Borborema Thermoelectric Power Plant.

3.
Braz. arch. biol. technol ; 64: e21210187, 2021. tab, graf
Artigo em Inglês | LILACS-Express | LILACS | ID: biblio-1355829

RESUMO

Abstract The multicriteria decision-making process is still an open problem, especially when the decision criteria are not numerical or fully outlined. Several numerical, intelligent, or hybrid techniques have been developed, creating contributions to this problem's solution. This paper is another step in this direction. Based on the Modified Analytic Hierarchy Process (MAHP), a methodology for diagnosis and performance analysis is presented for the dispatch ranking of generating units in a thermoelectric plant. The problem is complex because it covers a power plant, where 99 generating units may be dispatched, according to 10 possible evaluation criteria, which should be used together. This article also presents details of the implementation of the sensors necessary to add to the supervisory system existing in the Palmeiras de Goias Thermal Power Plant.

4.
Braz. arch. biol. technol ; 64(spe): e21210177, 2021. tab, graf
Artigo em Inglês | LILACS | ID: biblio-1285572

RESUMO

Abstract Microgrids (MGs) have increasingly attracted the attention of researchers, government officials, and electricity companies for the values and services they can add to the grid. They can operate independently as a single controllable unit in a coordinated way while connected or islanded, which make them suitable to integrate the growing amount of distributed energy resources (DERs) into the distribution network (DN). An active distribution network with high penetration of DERs could be redefined into a collection of microgrids in different layers, pooling their resources together to enhance the grid's performance in the sense of electricity as a service. However, enabling a microgrid-based power system infrastructure poses challenges concerning operation and control. In this paper, a comprehensive overview of research topics regarding microgrid operation are shown in a hierarchical or stratified manner, looking for a holistic vision of a microgrid-based distribution system. First, multi-objective optimization within one microgrid is formulated aiming to minimize costs and maximize battery life is presented. Second, the interaction among MGs, DERs and the DN was modeled using the OPF technique to represent the operation of the grid as a whole. Following, a methodology for collaborative optimization of multiple MGs operating together is presented and at last a theoretical framework for MG operation through decentralized energy markets is discussed. As a result, this paper aims to contribute to a broad vision of the distribution system based on microgrid operation in all its levels.


Assuntos
Política , Instalação Elétrica , Abastecimento de Energia , Brasil